Combine Federal Loans + BC Rebates for $0 Upfront Costs & Maximum Cash Back

Canada Greener Homes Loan

Finance 100% of your solar installation with $0 interest

  • Loan Amount: Up to $40,000
  • Term: 10 years interest-free
  • Upfront Advance: Get 15% upfront (25% for Northern/off-grid homes) for contractor deposits
  • Eligible Upgrades: Solar panels, batteries, heat pumps, insulation

Key Eligibility Rules:

  • Primary residence in Canada
  • Pre-retrofit EnerGuide evaluation required (after April 1, 2020)
  • No work started before loan approval – retrofits begun early are ineligible
  • Credit check required (no bankruptcies/consumer proposals) 25

BC Hydro Self Generation Program: Up to $10,000 Cash Back

Residential homeowners can claim dual rebates for solar panels and battery storage:

  • Solar Panels: $1,000 per kilowatt (kW) installed → up to $5,000 (min. 5kW for full rebate) 245.
  • Battery Storage: $500 per kilowatt-hour (kWh) → up to $5,000 (min. 5kWh capacity) 25.
    Example: A 7kW solar + 10kWh battery system = $7,000 + $5,000 = $12,000 total potential rebates (capped at 50% of system cost) 25.

Commercial & Multi-Unit Rebates: Up to $50,000

Businesses, farms, and strata properties unlock higher incentives:

  • Solar Panels: $1,000/kW → up to $25,000 59.
  • Battery Storage: $500/kWh → up to $25,000 59.
  • Social Housing/Indigenous Projects: $3,000/kW solar + $1,500/kWh storage → up to $75,000 each 5.

Key Eligibility Rules

  1. Pre-Approval Mandatory: Systems must receive BC Hydro pre-approval before installation begins 45.
  2. Grid Connection: Must connect to BC Hydro’s grid via the Self-Generation Program 28.
  3. Equipment Standards: New, CSA-certified panels/batteries (batteries in living spaces require extra safety certifications) 24.
  4. Deadlines: Installations completed after June 27, 2024, qualify. Rebate applications due within 18 months of installation 45.

Combine BC Hydro rebates with federal programs:

Victoria homeowner’s $30,000 system:

Critical Compliance Notes

How to Apply

  1. Pre-Approval: Submit design specs to BC Hydro via the Self-Generation portal 48.
  2. Installation: Use BC Hydro-certified contractors (e.g., listed in CanREA directory) 2.
  3. Claim Rebate: Submit post-install documents (invoices, CSA certificates) within 18 months 45.

Why Act Now?

Four steps of solar permitting applications and approval